WAMX 4192 knocks down Milepost 49 on the WSOR Waukesha Sub. In about another 5 miles, the train will begin rendezvous with MOW and begin dumping ballast.
W300 is leaving the Madison Sub and entering the Waukesha Sub as it heads across the North Leg of the wye in Milton. The train is on it's way to meet up with MOW near Palmyra to dump rock for WSOR... (more)
Ballast train W300, with WAMX 4192 in charge, takes the West Pass for a Muscoda, WI bound empty grain train led by WAMX 4191. The 4191 and 4192 were both originally C&O SD40s. Engineer Heeren is o... (more)