Ridin’ to a switch The conductor of Copper Basin Railway OT-1 rides the steps of GP39 No. 505 to a switch while running around their ore train at the ASARCO dumper in Hayden, Arizona,... (more)
Copper Basin Railway (CBRY) Copper Ore Train OT1 heads back to Ray Junction for another 48 loads of Copper Ore. They are seen here passing through Hayden, AZ.