The engineer on board the CBRY GP39 504 eases his train through the Asarco Dumper in Hayden Arizona at a snails pace while the unload process commences.
Ex C&O/CSX GP39 504 leads today's mine runs as the second train of the day approaches the "dumper" in Hayden, Az. The traction motor blowers are performing their job well as the surrounding air fi... (more)
The engineer of this east bound loaded ore train notches it out a couple times to maintain track speed while passing DeBois Ranch which is between Kearny and Hayden Junction.
Ex C&O/CSX GP39 504 leads today's mine runs as the second train of the day eases through Riverside, Az. The train is seen between Ray Junction and Tunnel Two.