With 74 loads of ore in tow the engineer of the three tunnel motors cuts the power back and will start to apply the dynamic brakes in just a few minutes for the down hill run to the Allegheny rive... (more)
The smell of brake dust and diesel exhaust with the squeal of metal on metal filling the air as the 15:00 Proctor Road Switch comes down the 2.2% grade from Proctor with taconite loads for the doc... (more)