The BLS Re 4/4 175 and 179 pulling freight train 47671, loaded with aluminium blocks, to the aluminium plant Constellium at Singen (Hohentwiel) in Germany.
The SBB Re 4/4 II 11155 is pulling the nearly one hour delayed overnight train CNL 471 from Berlin (Germany) to the final destination Zürich HB (Switzerland).