Four reflects in a nice sized pond after a day of rain. This was the first time the 4 had ran in a long time and it is only fit that a C&O engine is in the old C&O/PM roundhouse!
URR 2 sits inside the shops along with it's old prime mover as the shops crews have it torn apart for a rebuild during the first ever family days at the Hall shops. The engine now wears the yellow... (more)
Valley Railroad No 3025s trailing truck is being readied to be placed under the locomotive int he railroad's Essex, CT shops. This was during the reubild project of the former Knox & Kane Chinese... (more)
Putting the cart before the horse, so to speak. The drivers have been placed in front of the Mikado in preperation for their placement under the locomotive during the rebuilding of Valley Railroa... (more)
A rebuilt 3000-hp prime mover has just been lowered into B&LE 907 as it moves through the rebuild process at the DM&IR's shop complex. The light green primer gives the locomotive an odd glow but s... (more)