A train with 160 empty wagons heading towards Rondonópolis, MT, passing over Km 0 of Ferronorte at the railway bridge over the Paraná River.
Train loaded with 120 wagons bound for Rondonópolis MT.
Southbound loaded I02 led by AC44i #9850 photographed between Ouro and Tutóia yards.
Cellulose train L95 double heading C44-9W locomotives still in the ALL scheme, arriving in Ouro yard.
Northbound empty I05, with 7 locomotives (most trailing units) photographed in the Araraquara railroad loop, between Ouro and Tutóia yards.
Southbound train I70, double heading the brand new ES44ACi locomotives from Suzano, photographed between Tutóia and Ouro yards.
The first ES44ACi in Brazil: The new model was assembled in the Wabtec plant, in Contagem-MG. The first ones, are from Suzano, numbers 2543 and 2542. In the photo, both units were photographed at ... (more)
Tutóia refueling station, with AC44i´s waiting the next duty.
The photographer and the train: Intermodal D71, departing Tamoio yard led by AC44i #764.
Northbound empty I01 led by AC44i #9857 photographed between Graúna and Itirapina yards.
Doublestack D73 led by AC44i #9810 photographed in the recently open double track section, between Rio Claro and Cordeirópolis.
Loading a train with soybeans in a grain elevator in Marialva.
AC44i #9856 leader of helper set N63, pushing VLi U62 at the grade of KM 80, between Canguera and Caucaia.
Northbound intermodal D73 led by AC44i #9810 (the first one from Rumo) photographed between Cordeirópolis and Rio Claro cities.