The Lackawanna-heritage unit leads the very-low-priority KAILC through Southern California on its way to LATC near downtown Los Angeles. Railfans in SoCal were waiting on this train for at least 2... (more)
The Robertson Ready Rock train shuttles back and forth between a rock quarry in Cabazon CA and a cement plant in Gardena CA. It is seen here making (what the symbol indicates) is its second run of... (more)
A single engine (and one from Mexico) leads the UP autoracks from Gibson IN to Mira Loma CA through the western end of San Timeteo Canyon. There was another unit on the back of the train.