CNW 411 leads the last westbound train of the day on IRM's trackage passing by CPL signals
BN 3 holds at IRM.
MN&S 21 sits on display at IRM.
SP 1518 leads the caboose train east of Union.
CRIP 4506 and CBQ 504 lead a caboose train at IRM.
#92 splits the semaphores east of IRM.
CNW 411 leads the CNW bilevel train west past position lights at IRM.
CBQ 504 rests outside Barn 2.
CNW 411 leads the bilevel train down the main.
The CNW commuter trainset heads past Minnesota Transfer #200 during Diesel Days.
ATSF 92 brings the coach train past Spaulding Tower at IRM.
BN 3 backs into Barn 9, concluding its runs for the day.
CB&Q 504 idles outside the diesel shop.
CRI&P 4506 prepares for departure, heading the first caboose train of the day on August 12th, 2018.