URR 25 reverses to the switch in North Bessemer, I believe it picked up broken down BLE 900 while doing this.
Power for start-up of the Florida Coast Railroad.Second day of operation.A G&W Company.
Coal for interchange at North Bessemer passes the hind end of the southbound slab train.
Lettered City of Birmingham
MP15DCs NS2361, NS2360 & NS2386 wait between switching duties
Ore loads from North Bessemer interchange head south on the N Bessemer Branch towards the US Steel Edgar Thomson Works at Braddock.
Passing an old SP crossbuck, Ex-MP switcher leads a short freight South towards Huntington Beach,CA. on what was one of the first training runs for remote control in the area.
Running on jointed rail, the Union's hot slab train works upgrade at Bull Run. Standing trackside, it's easy to feel the heat emanating from the freshly cast slabs.
The slab train's short journey is almost over, the Irvin Works are just ahead.
Here's Job 76 disrupting the concentration of the golfers, as it takes a cut of 57 autoracks to store at Evansville while GM plant nearby retools.
Five URR MP15DC's are pulling for all their worth to get a loaded coke train through Dravosburg.
NS 2431 with new frame stripes.