CLF1 stabled with a rake of new SSR BGUY grain wagons at Appleton Dock.
CLF1-C501-CLF2 with 2MC5 empty SSR grain to NSW at Albion.
T381 leading an SSR works train from Warragul passes through South Kensington.
VL353-B80 with 9475 Maryvale paper train run past CLF1-44223-C501-CLF2 stabled with an SSR grain consist at Appleton Dock.
CLF1-C501-44223-CLF2 await departure from Appleton Dock with 1MC5 empty grain to NSW.
P17-T356-T381 with an SSR works train at Ascot Vale.
CLF1-S311-CLF4-CLF2 stabled with an SSR grain consist at Appleton Dock.
G539-BL30 run past CLF1-GM27-S311-CLF2 stabled with an SSR grain consist at Appleton Dock.
CLF4-S311-GM27-CLF1 hauling 7MC5 empty SSR grain to NSW pass through Albion at sunset.
CLF2-CLF4-CLF1 power upgrade through Albion with 3MC5 empty SSR grain to NSW.
P17-EV120-T386 returning from an infrastructure evaluation run to Warrnambool approach Newport.
S303-T387-T357 with an SSR works train at Appleton Dock.
T357-T387 with an SSR works train at South Dynon.
T386-EV120-T385 on an infrastructure evaluation run to Gippsland pass through South Yarra.
T386-EV120-T385 returning from an infrastructure evaluation run to Bendigo pass through Sunshine.