P16-EV120-P14 returning from an infrastructure evaluation run to Ballarat approach Sunshine Station.
P16-P14 hauling a retired six car Comeng set to Bendigo approach St Albans.
44223-4908-C501-4814-CLF4 approach Sims Street Junction with 3MC5 empty grain to NSW.
The colourful combination of CLF4-4814-C501-4908-GM10-44223 hauling 6CM7 loaded grain from NSW coast across the Maribyrnong River bridge.
CLF4-44223-C501-4908-852 with a loaded SSR grain train from NSW to Appleton Dock cross the Jacana flyover.
P14-EV120-P16 on an infrastructure evaluation run from Sandringham pass through Hampton Station.
P16-EV120-P14 returning from an infrastructure evaluation run to Mernda at West Richmond.
P16-T395-T356 with an SSR works train near Macleod.
42103-S303-CLF1 shunt at Appleton Dock.
P14-EV120-T386 returning from an infrastructure evaluation run to Carrum approach Caulfield.
Streamliners 42103-GM10 work the AK test train to Maroona towards Altona Junction.
P14-EV120-T386 returning from an infrastructure evaluation run to Cranbourne at Oakleigh.
P17 and T386 running in push pull mode pass through Albion Junction with a rail train from the McIntyre Sidings.
CLF1 stabled with a rake of new SSR BGUY grain wagons at Appleton Dock.
CLF1-C501-CLF2 with 2MC5 empty SSR grain to NSW at Albion.