T385-T386 hauling a retired Metro Comeng set approach the McConnell Dowell rail plant yard in Sunshine North.
T386-EV120-T385 returning from an infrastructure evaluation run to Sunbury pass a Metro Comeng set at Footscray.
CLF1-CLF2-S311-4904 with 7MC5 empty SSR grain to NSW at Albion.
4911-4904 stabled with an SSR rail train at McIntyre Loop.
4904-4911 with an empty SSR rail train stabled at McIntyre Loop.
CLF1-GM10-GM22-CLF2 cross the Maribyrnong River bridge with 7CM4 loaded grain train from NSW shortly after sunset.
S312 unloads an SSR grain consist at the Allied Mills plant in Kensington.
P18-P16-P17-S312 stabled with a broad gauge SSR grain consist at Appleton Dock.
CLF2-GM10-S311-GM22 await departure from Appleton Dock with 7MC5 empty SSR grain to NSW.
GM10-S311-GM22-CLF2 work 5MC5 empty SSR grain through West Footscray.
T381-EV120-P14 on an infrastructure evaluation run to Brooklyn pauses on platform 4 at Sunshine.
Streamliners GM10-S311-GM22 stabled with an SSR grain consist at Appleton Dock.
GM10-GM22 race through Laverton en-route from Horsham to Melbourne.
T381 with an SSR works train at Southern Cross.
CLF4-S311-CLF2 power through West Footscray with an empty SSR grain train to NSW.