CLF1-GM27-4904-CLP12 stabled with an SSR grain consist at Appleton Dock.
CLF1-4904-CLP12 stabled with an SSR grain consist at Appleton Dock.
CLF1-4904-S311-CLP12 coast through Albion with 4MC5 empty grain to Oaklands.
Streamliners S311-GM22-CLP12 prepare to attach to their SSR grain consist at Appleton Dock.
4911-S311-GM22-CLP12 accelerate through Albion with 2MC3 empty grain to Oaklands.
CLP12-GM22-S311-4911-CLF3 work 7MC3 empty grain to Oaklands through Sunshine.
S312-T364-VL360 running light from South Dynon to Bendigo at Middle Footscray.
T386-P18 running light from South Dynon to Bendigo pass through Sunshine on the Regional Rail Link line.
T363 unloads an SSR grain consist at the Allied Mills plant in Kensington.
C501-GM22 prepare to attach to S311-4911-CLF3 at Appleton Dock to form train 2MC2 empty grain to NSW.
C501-GM22-S311-4911-CLF3 await departure from Appleton Dock with an empty grain consist to NSW.
CLF3-4911-GM27-48s35-CLF1 await departure from Appleton Dock with an empty SSR grain to southern NSW.
CLF3-4911-GM27-48s35-CLF1 approach the Bunbury Street tunnel with 6MC5 empty grain to NSW.
T385-T386-T381 with an SSR works train on the up local line at Armadale.
In fading light SSR's 5MC5 empty grain from Appleton Dock to NSW rolls through Albion behind locos CLF3-S311-4911-48s35-48s36-48s28-GM27.