P14-EV120-P17 on an infrastructure evaluation run to northern Victoria cross the Maribyrnong River bridge at Footscray.
P16-P14-T395-T364 hauling two spoil wagons to Tottenham Yard at Newport.
P16-EV120-P14 on an infrastructure evaluation run at North Melbourne.
The Melbourne city skyline looks on as S312 rests at Kensington yard in between shunting duties.
P16-EV120-P14 returning from an infrastructure evaluation run to Frankston at Chelsea.
Empty SSR grain train 9793V from Appleton Dock to Murtoa rolls through Laverton behind EL62-CLP12-GM27-VL354-EL56.
P18-EV120-T364 returning from an infrastructure evaluation run to Sandringham cross the Yarra River bridge at South Yarra.
T386-T395-S313 with an SSR works train to Shepparton at Albion.
T386-B76-S317 with 9195 empty grain to Manangatang approach Williams Landing.
P16-T386 hauling H1-H2-H5-H3 from Tottenham Yard to Bendigo approach Sunshine.
T381-T363 hauling H1-H2 from Seymour approach Newport.
EL62-S311-B61-GM27-EL56 with an empty SSR grain train to Ouyen roll through Laverton.
B75-B80 shunt a rake of grain wagons in Tottenham Yard.
B76-S317 stabled at Kensington yard with an SSR grain train.
B76-B75 with a loaded grain train from Tottenham Yard to Kensington.