Both loaded coal trains here at Black Thunder Junction are led by new units. One month old C&NW 8678 was built in April, and BN 9429 was built the month before. The C&NW train was loaded at Jacobs... (more)
An empty Missouri Pacific coal train with a DB equipped 6000 series leader is seen from the Cahokia Airport overpass just south of Valley Junction, IL.
Here's a view of an early Metro-North Poughkeepsie-Harmon shuttle. The motive power is beginning to change with the B23-7 in service, and the FL9 appears much cleaner than when CR/MTA operated the... (more)