New England Southern is seen headed North of Concord with 8 loads, an unusually long train for them. Six of the cars are spine cars loaded with ties destined to be interchanged with Plymouth & Lin... (more)
During the first run of the year, the New England Southern crew heads North on the former Boston & Maine "White Mountains Mainline". Former SP/UP SW1500 is the sole power for NEGS as the... (more)
Wolfboro railroad's 78 mile Central Division operation is about 6 weeks old. It consists off former B&M trackage to Laconia and Lincoln NH, leased from the state of New Hampshire. The train led by... (more)
B&M 1576 and 1575 plus a third GP-7 idle at Concord Engine Terminal on a warm spring weekend. The squared portion of the long hood noses was for train lighting equipment for their original assignm... (more)