ALCO Safari Day 5, LA&L: Moving along at a good clip now, the LA&L road train sprints over Pole Bridge Rd. LA&L's ROW is well maintained, and track speed is 25 MPH.
ALCO Safari Day 5, LA&L: After gathering a handful of cars from the Lakeville yard, the LA&L road job comes up the grade, and around the curve at Conesus Lake Jct. heading for Rochester. Th... (more)
ALCO Safari Day 5, LA&L: Shortly after going on duty, the mid-day road crew pulls the power out of the shop, and gets ready to head North. Power today is ALCO C425 #425 and C430 #433.
ALCO Safari Day 5, LA&L: After finishing the pull/spot at ADM, the morning crew shoves back to the main Lakeville yard with outbound cars. ALCO S-2, #72 was built in 7/1941 for the Buffalo ... (more)
ALCO Safari Day 5, LA&L: At 80 years old, and still being used every day, LAL 72 is no slouch. She can still kick and switch with the best of 'em, as evidenced by the morning crew switching... (more)