After crossing the Columbia River from Wishram, WA (seen in the distance) a southbound begins the climbs up Deschutes River Canyon. The UP main, US 30 and I-84 are just below.
Three of Simpson's locomotives are visible. In a switch move the 1200 has come out of the siding after holding for the 1202 to pull up with the dump car. After grabbing the mud load Jerry Miller... (more)
In addition to hauling "waterwood" up the hill there was a mud load this morning. They have just emptied the Difco side dump into a huge mud puddle. The 1201 idles nearby on the main.