As it leaves the Dry-sort yard the 1201 is crossing Hanks Lake Road heading back to Shelton. Mt Washington and Mt Ellinor are seen in the distance.
the 1201 crew shunts loads around 4 PM on the Simpson property in preparation for the next trip out of Shelton.
The 1201 leading a log train near Chappell Crossing on the return to Shelton from Mill 5.
The first locomotive to move across the new Goldsborough Creek Bridge was the 900 "City of Elma" at 2:15 PM today. Trainman Jerry gives the thumbs up as Dispatcher Dave looks on from the cab. Th... (more)
MOW crew prepare the rebuilt Simpson Railroad railbed at the approach to the new Goldsbough Creek Bridge. The railroad is near to normal operations again after a 14 month hiatus.
The new Goldsborough Creek span was dropped in place today and Simpson MOW old-timer Jerry is resetting rail in preparation for trains that will roll again next week. The old bridge was destroye... (more)