GTW 4924 on the 0800 Switch Engine.
BNSF on Fair Field Ore loads at DMIR's Steelton Yard.
E.T. Ore loads at Steelton Yard on the DMIR.
NS 9378 on the point of E.T. Ore loads at DMIR's Steelton yard.
CSXT Ore empties can be seen from the cab of WC 1552.
CN 5742 leads M346-5 up the steep climb of Byron Hill south of Fond Du Lac, WI.
CSXT 788 is the first New CSXT paint scheme unit to come to the WC.
CSXT 7735 looks on at the Stevens Point Roundhouse.
A view from the cab of WC 1552 in the middle of Stevens Point Yard.
WC 1552 pulls the Plover Patrol pass the "P Line" switch.
WC 2057 at Stevens Point, WI
WC 6003 at Stevens Point, WI
WC 7528 peeks between 2 of her sisters.
Power waiting for trains at Stevens Point, WI.
The rock job wait for the loader to finish.