FDWS1T-3 in the siding at Nelsons.
WC 3005 working on L020-3 at Waupaca, WI.
M34041-02 starts to climb the Neenah hill with Sulfer loads trailing.
Domtar 26 at Nekoosa, WI
CN 5439 gets snowed on while sitting on the ready track.
CN 5706 in the siding at Simar for a southbounder.
The view looking back on M34391-23 as it crosses the curved bridge on it's way up the hill to Noepeming Jct.
CN SD50 No. 5439 at Pokegama yard.
Helper power prepares to head north to shove a train stalled on the hill.
M341-21 at waits it's turn to climb the hill out of Steelton Yard.
CN 2559 in the siding at Simar on the CN's Rainy Sub.
The curved bridge on the climb to Neopeming Jct on the DMIR.
E.T. Ore loads seen from the cab of M34391-22.
M34841-22 arrives at the north end of Pokegama Yard
BNSF Fair Field Ore loads and NS E.T. Ore loads wait to blast off at DMIR's Steelton yard.