Steamlocomotive HG 3/4 4 of the DFB is on a warm up run from Realp through the gorge of the Furkareuss. Beautifully decorated she will pull the regular train 131 from Realp to Oberwald on the day ... (more)
Steamlocomotive HG 3/4 4 of the DFB is pulling train 131 of the DFB from Realp to Gletsch, decorated because of the inauguration of the last leg of the Furka mountain line from Oberwald to Gletsch... (more)
Snowdon Mountain Railway No 4, Snowdon, descends towards Llanberis with the "works train". This supplies the cafe at the summit, and brings down it`s rubbish.
Former Mower Lumber Company shay #4 shoves a flatcar at the 2nd Switchback in November 1960. At this point the line had been sold for scrapping and this train was on its way to finish pulling the ... (more)