Drilling at Bridge 60. 2409 will eventually join 2045,414 and 2457 to head up SC-7.
Drilling at Bridge 60. Caboose 885 will be on the first leg of SC-7 today, which will drop off 885 and 3642 at Von Storch prior to continuing to Carbondale. 3642 has an ailing turbo. Rotten luck.
BR1 gets into the clear at Steamtown while an excursion prepares to pull ahead.
BR1 pulls back onto home rails after making a transfer run to NS at Taylor with a C425 leading.
The previous day's WT-1, which was dumping boulders at Elmhurst, lays over in Moscow.
Duo of Alcos sits tied down for the day.
Crew at work.
2461 and 405 came up from Bridge 60, but after some shuffling- 2452 and 2461 will head back light.
VANCOUVER WA Oct 2 1978 — A sunny day finds Burlington Northern C425 4262 undergoing work at the engine facility south of West 39th Street. The unit was built in June 1966 and delivered as Spoka... (more)
Quiet morning in Greenridge.
C425 2461 sits outside the shop, while "Herself", as I am referring to the PA , gets attention inside.
Just back from Taylor and tied down for the day.
After waiting for almost 2 hours, DL PO-75 showed it's face as it emerged from Nay Aug Tunnel west portal.
A short PO-74 led by two four axles.
A short PO-74, headed to switch Ardent Mills, with four axle duo (C425 & C420) leading.