A sunny June morning and PO-74 passing Snag Pond .
Building PO-74 in thick fog.
Smoke show at Snag Pond.
Six axles and four axles shuffle around early in the morning.
Getting to work is a very short PO-74.
PO-74 passes Snag Pond en route to switch Ardent Mills. My usual spot to get this shot was blocked by Utility trucks, so a new opportunity presented itself.
A short PO-74 led by two four axles.
A short PO-74, headed to switch Ardent Mills, with four axle duo (C425 & C420) leading.
The usual trio of six axles drags PO-74 this Sunday morning.
Switching Keystone.
A later than usual PO-74 arrives Toby to switch Keystone.
Cresting the grade and putting on a smoke show.
With a double ended (power) DL-3 this morning; PO-74 got underway later than usual. Passing through Gouldsboro en route to switch Toby.
PO-74 with a high and wide load to the Water Gap.