A pair of "new" GEs assigned to the ore pool out of Two Harbors, MN hold the main at Biwabik with loads while they wait for a northbound empty coming their way shortly.
CN 2004 rounds the bend through the yard at Biwabik and is about to take the N. Biwabik signal as the EOT device follows along on the tail end of U790 as the northern lights do their thing in the ... (more)
The first trip for the shiny new AC44C6M's that are now being assigned to the former Missabe comes through the yard at Biwabik as they travel back to Two Harbors, MN with iron ore loads.
Pellets from the Minorca mine make their way south on the CN Iron Range sub at Biwabik with evidence of operations from the mine visible in the background. Also interesting is the Plasser-Theurer ... (more)