A trio of Dash 8s round the bend heading north with 145 empties for the U.S. Steel Minntac plant west loadout pocket before heading back south for home at Two Harbors.
A loaded taconite train from the Minntac plant gets a roll-by from the crew of the Keenan local job at Biwabik. The taconite pellets are headed to Two Harbors while the local will do their work a... (more)
A snowy trip for the entire 74 miles along the Iron Range Sub is coming to end as CN 2028 is about to cross Highway 7 turning north and getting on the CN Missabe Sub and then the CN Minntac Sub ar... (more)