After assembling their train in the yard at Keenan, it's time to come out and hit the Missabe sub for the trip north up to U.S. Steel's Minntac plant for loading these 140 cars with 20,000 tons of... (more)
With their work done at Keenan yard and the train assembled on the main again it's time to dial up the dispatcher and get some signals for the trip heading down to Proctor yard.