2 trains move through CP Wood westbound. The one on Main 2 cleared the CP first and note both FREDs in the interlocking and disappear around the corner.
NS 615 in the paint shop just after repainting. This was the first road slug of it's series to be built on a new frame instead of a existing frame from a locomotive.
NS 03T/Amtrak 29 lights up and goes through the signals at CP Enon on the Fort Wayne Line, today replacement signals stand next to the current G Type ones.