Snow continues to fall as blue hour switches to darkness while BLE 906 gets lights to pull iron ore loads from United Taconite and begin the return trip back to Proctor yard.
With a train of steaming pellets from the Fairlane Taconite Plant in tow, DMIR 406 leads CN U71781-04 as it slowly makes its way into the yard at Proctor, Minnesota to tie the train down where it ... (more)
With a pair of Bessemer tunnel motors bracketing an SD40-2W, Canadian National dock job R921 shoves out on to Dock 6 in Duluth, Minnesota with a train of loaded ore hoppers for unloading. The out ... (more)