After completing their work at Keenan yard, CN 5485 has reassembled the train and starts to pull on Main 1 and thus starting the race to the end of the double track section on the CN Missabe sub a... (more)
A long empty all-rail taconite train slows for the upcoming stop before shoving into Keenan yard where the train will be split and staged until their load time at the U.S. Steel Minntac plant beco... (more)
In some of the last sunlight of a nice February evening, a lengthy southbound BNSF manifest claws its way to the top of the grade from Marshall to Florence, MN. A cloud bank was moving in, so the ... (more)
After waiting for a northbound to clear into the siding, a southbound manifest with a CSX AC4400 rebuild on the point gets underway again. A Ferromex SD70ACe is the DPU of the northbound. That H2 ... (more)
After being held briefly for a westbound to move from main 2 to main 1 at the Richards Spur crossovers just around the curve in the distance, an eastbound accelerates into Detroit Lakes, MN on a c... (more)