Fresh Help: NS 4689, a brand new ACC4C6M, brings up the rear of manifest NS 38G, as the train heads through the tunnels in Gallitzin, PA, having reached the crest of the grade.
AMTK No 119 leads its train through the Allegheny tunnel in Gallitzin, PA, bound for Pittsburgh. The Gallitzin tunnel was built in 1854 by the Pennsylvania Railroad, and later expanded to 2 track... (more)
Allegheny Elevation: NS 36A heads into the Gallitzin tunnels, as the train approaches the crest of the grade before descending down into Altoona.
Out of the portal! Amtrak's westbound Pennsylvanian #43 led by P42DC 129 rolls out of the tunnel past the Gallitzin Tunnels Park. The park overlooks the entrance to the West Tunnel, which provides... (more)
Amtrak's westbound Pennsylvanian exits the main tunnel at Gallitzin. Originally two single track tunnels, the tunnel to the left was sealed when the right bore was enlarged to handle two tracks. ... (more)
Amtrak 43, the westbound Pennsylvanian, emerges from Allegheny Tunnel in Gallitzin, PA on a beautiful summer afternoon.
NS 591 with a brand spanking new leader is uphill approaching CP AR in the snow on track 1. Running up "The Slide".
Conrail Mail-3
Oil train with a pair of BNSF's in consist heads down the slide before reaching a tunnel.
4 SD40Es shove on the rear of an eastbound coal train that nears the crest of the summit on the Pittsburgh Line.
25Z pops out of the Gallitzin Tunnel on their way west in the late afternoon.
NS 7246 is part of a two unit helper set rolling into the Gallitzin Tunnel.
NS 4343's headlight illuminates the interior of the Allegheny Tunnel as it heaves a stack train westbound over the grade.
The owner of the Tunnel Inn informed us that the westbound 21E had not one, but two Norfolk Southern Heritage units on it, with the Penn Central 1073 on the point followed by the Lehigh Valley 810... (more)