Due to some MOW work at West Thenard, the 0600 UP Dock Job has to go the long way to turn their power at Farragut before returning to ICTF to pick up an inbound train for the Harbor.
The 1430 Reyes Switcher approaches the south end of the Patata Industrial in Compton. They'll shortly pass CP-Compton and head onto the Reyes Spur. On the left is the Alameda Corridor main.
The 0800 UP Dock Job comes off the UP-controlled portion of the Alameda Corridor and onto the PHL dispatched territory at CP-West Thenard. The YPUP08 has 69 loaded platforms off of an inbound IDIL... (more)