A big GE B36-7 leads two Geeps and an intermodal train westbound over the Conestoga River. Note the staggered stonework in the arches. When built, there was provision made for doubling the width of the bridge to four tracks at some point in the future, which was never done. The staggered stones would have interlocked with the "new half" of the bridge.