Honored guest UP 1983 passes home-road INRD power after finding itself drafted into Powder River coal train service. This particular train runs through on INRD to Newton, IL.
Yes, I was standing next to Samuel.
LIRC 2001 makes its first run as a lead unit.
ISRR run-though power roams INRD rails, seen in the last mile to the Bear Run mine loadout loop.
NKP 765 eases through the north wye at Colsan to take the last of three Saturday excursions back to Bellevue.
Moving compass East and timetable North, CBRED passes through the improved connection at Linton to switch to timetable South and complete its short trip back to ISRR rails at Beehunter.
INRD coal train run-through with power leased by ISRR departs mine property.
NKP 765 shakedown run.
Trio of SD38s leased to Indiana Southern bring a train out of Bear Run mine on Indiana Rail Road rails.