During the night before, there were about 30 inches of snow on the Bernina pass. The overhead wire was iced and the trains couldn't run anymore. The diesel powered overhead wire maintenance and re... (more)
During the night before, there were about 30 inches of snow on the Bernina pass. The overhead wire was iced and the trains couldn't run anymore. The diesel powered overhead wire maintenance and re... (more)
When the Re 465 of the BLS, built from 1994 to 1997, were ordered, the installation of a type IIId multiple control system was required, for joint operation with the brown Re 4/4 (Re 425) of the B... (more)
When the Re 465 of the BLS, built from 1994 to 1997, were ordered, the installation of a type IIId multiple control system was required, for joint operation with the brown Re 4/4 (Re 425) of the B... (more)
The new Stadler built cogwheel diesellocomotive HGm 2/2 # 702 of the Matterhorn-Gotthard Bahn (MGB) is pulling the track measuring car P # 10175 of the ARGE FahrwegDiagnose (Sersa, INovitas, Kistl... (more)