A duo of green machine SD40-2s leading a local East from Akron, Colorado towards McCook, Nebraska on the Akron Sub.
My buddy Noah and I made the 876-mile drive to Akron on the night prior and go... (more)
Immaculate Re 4/4 II # 11193 (Re 420 # 193) of the SBB, built in 1970, is leaving the 1090 meter long Leggistein loop tunnel between Göschenen and Wassen with the PE 3092 GOTTHARD PANORAMA EXPRES... (more)
Double Gotthard locomotive Ae 8/14 # 11801 of SBB Historic, built in 1931 by SLM and BBC with 5514 kW, with charter train 31066 for Bahnreisen Sutter from Bodio to Erstfeld, crossing the middle Me... (more)
Double Gotthard locomotive Ae 8/14 # 11801 of SBB Historic, built in 1931 by SLM and BBC with 5514 kW, with charter train 31055 for Bahnreisen Sutter from Erstfeld to Bodio and back, between Wasse... (more)