In 1989, Kwun Tong Line extended its service to Quarry Bay after the opening of Eastern Harbour Crossing. MTR expanded the train fleet by ordering the fourth batch of Metro-Cammell Train, the G-St... (more)
There were 61 units of 3 car train built for the first two batches of Metro-Cammell Train in 1982, called 3094 Stock. Before the mid-life refurbishment, these trains could serve as a 6/9/12-car fo... (more)
One of the massive plans of the ‘Rail Gen 2.0’ project was to introduce new generation trains for the urban lines with upgraded signaling systems. In 2015, MTR awarded the manufacture of the n... (more)