Rolling along the shores of Kamloops Lake, CP ES44AC 8912 crawls towards at stop signal at Tunkwa on the south track of CP's Thompson Sub. With train 101 ahead and 860's coal empties coming on the... (more)
After working a customer in Savona, CP's V52-14 "Ashcroft Local" departs the double track heading back to Ashcroft.
V52-14, CP's Ashcroft Wayfreight, has just lifted 3 cars out of the customer track at Savona Specialty Plywood, and will tie back onto the train before setting out 2 empties.
Kamloops-Coquitlam train Q109 coasts down the main at Savona behind a trio of GE products.
CP's Ashcroft wayfreight slows to a stop to work Savona Specialty Plywood. After setting out and picking up some cars, they would be off to Ashcroft.
A Roger Puta Photograph
On a beautiful morning, a westbound Canadian Pacific manifest freight traces the shore of Kamloops Lake at a location called Dodge east of Savona, British Columbia, on September 29, 2015.
CP 8755 gives a shove on the rear of an eastbound empty coal train that just met a westbound grain train on CP's mainline at Savona, BC. The train will continue east to Kamloops along its namesake... (more)
CP 9813 approaches the double track at Savona, BC with a westbound grain train. What fall foliage is available is in full color as the train reaches the west end of Kamloops Lake and prepares for ... (more)
CP 9813 heads its westbound grain train around a curve approaching a short double track segment through Savona, BC. It will have a rolling meet with a CP eastbound coal empty as it leaves the lake... (more)
9732 & 8747 head east through Savona with an empty wheat train
9592 (GE ES44AC) and SD30c -ECO 5007 head east with an empty coal train around the southern bank of Kamloops Lake at Savona