At 16.40 on the last day of January the first load of ballast is dropped at Km post 80 on the Channel Tunnel Rail Link. The hoppers are Rail Track's new autoballaster wagons which are radio contro... (more)
The first train load of ballast, in 25 RailTrack autoballaster wagons, arrives at the Beechbrook Farm Channel Tunnel Rail Link construction depot. Nine months earlier this site was just a green fi... (more)