After meeting each other at Rocky, the MNYGJ continues west on the main at Clay while an empty ballast train passes by the intermediate signal at MP 16.1. The distance between the trains has expan... (more)
SP 9333 looks good in the then new SP Speed Lettering scheme as the 2nd out Tunnel Motor graphically portrays how most of the SP engines looked at this time! This Eastbound loaded coal train bound... (more)
The 7 unit head end (6 units visible) of this westbound coal train is climbing the steep grade to Tunnel 1 as the rest of the train is still snaking through the curve at a much lower elevation.