399 of the BR 185 engines are in service with DB AG. 185 085-149 are equipped for services in Switzerland. They are equipped with ZUB/Integra signalling systems, cameras and two additionel pantogr... (more)
The Hangartner trailer train, with the BLS Re 485 018 in the lead, on the way to Italy.
DB AG 185 115 and 185 139 leading the "Winner Spedition" intermodal train to Italy.
BLS cargo Re 485 013 with a RAlpin train from Freiburg (Germany) to Novara (Italy) via the Lötschberg base tunnel.
Bombardier delivered the Re 482 015 to SBB cargo in 2003. The locomotive can run under 15kV and 25kV voltage systems and is approved to run in Switzerland and Germay.