CP 5108 of recent rebuild leads the Bensenville-Schiller Park stack transfer under the signals at B-12 in F5ranklin Park, IL.
Amtrak Cascades F59PHI 457 brings up the rear of a eastbound test train at Franklin Park.
Amtrak Surfliner F59PHI 457 brings up the rear of a westbound test train at Franklin Park.
All four CP executive F units bring the business train under historic signals at Junction B-12 in Franklin Park, IL.
CBFX 6025, a former BN SD60M, leads G45 under B-12.
NS SD70 2520 holds in Franklin Park with CP 281.
NS SD70 2520 leads CP 281 east through Franklin Park.
With Soo Line acquisition of the Milwaukee Road, several units did received Soo Lines red/white colors, but the vast majority received the unattractive "bandit" paint scheme; cheap flat black pai... (more)
An F40PH shoves an inbound Metra train towards Chicago after making a station stop in Franklin Park. The train passes under a classic signal bridge at Tower B12 on CP's Elgin Sub. Locomoti... (more)
A SOO SD60 and SOO SD60M switch out the east end of Bensenville Yard.
MN1 transfer job from Bensenville shoves towards Schiller Park as its seen passing the Belmont Ave Metra depot.
CP transfer from Bensenville to Schiller Park heads east on the Elgin Sub at B12. Once on the east side of the interlocking they will shove onto the CN Connection and all the way up to Schiller Pa... (more)
CP GE rebuild 8033 departs Bensenville yard with the first of the day's two 686's.
CP 686 turns down the IHB with an NS SD40E leading.