PHL's 1PM UP Dock Job has a long string of stacks on the coupler as it takes the Long Beach Sub and heads south into the spaghetti bowls of tracks ahead of it.
The 5AM dock job has an incredibly long cut of baretables on the coupler as it shoves up the Long Beach Sub, about to enter Union Pacific's Dolores Industrial Lead on its way to drop the empties a... (more)
The 0700 BNSF Dock Job is one of the few PHL Dock Jobs that consistently uses modern road power, but today's edition was using an NRE six axle genset and MP20C-3. Here they're shoving down the &qu... (more)