A northbound T1 train rumbles into the station past an onlooking totem pole on the platform of Museum Subway Station. Weird at first, but over time one gets used to the post-renovation Museum-them... (more)
The end of the evening rush hour - the MU PCCs from Bloor St were placed in train operation on QUEEN 18 months after the subway opening. Three of us staked out a photo line in the Humber River ma... (more)
Reconstruction of the Don River Bridge required that a wooden trestle be built beside it to handle the heavy streetcar traffic of that period in time. Today, they'd just use temporary buses!
TTC's sole Witt still on the property makes occasional forays outside the shops, always trailing a PCC and followed by a CLRV (here 4041, newly-air-conditioned) as the brakes are not fully trusted... (more)