It's back to work on the Monday after Christmas 2015, and the SMS crew is ready to depart the crew area in the Morrisville Industrial Park with the Baldwin DS4-4-750 #102. The old switcher as well... (more)
with less than half a car to unload into the awaiting 18 wheeler SMS #1337 will pull the mty cut of covered hoppers off the conveyor track and spot another cut for unloading. Its not uncommon to s... (more)
Switching out the conveyor....SMS has operated a very healthy Rail to Truck conveyor business at the NEIP since they took over switching at the park in 06.