Two QJ's restart a loaded train from Fuxincheng. This line, built only in 1999 but 100% steam operated, was being electrified in 2004 with the juice due to be turned on early in 2005.
A pair of QJ's drifts into Fuxincheng with a standard train of 21 loads. The river is frozen solid but with afternoon temperatures well above freezing, spring is near at hand.