This train was moving across the bridge at about 25 MPH. The flood gates on Lake Lavon are rarely open. Catching a train on the bridge with the dam and the floodgates open
'took a little work".
NPWJ (Newport-White River Jct) rolls south through the north country on it's way toward Wells River, VT for a meet with WJNP to swap crews before continuing on to White River Jct.