A plethora of power, a gaggle, a grouping, a variety, a consortium of all things CN staged outside the Proctor diesel house on a cold and windy late fall morning all idling away until the next cal... (more)
Loaded ore makes its way into Proctor behind a DM&IR tunnel motor, a CN SD40-2W and an IC SD40-3. The EMD's that have served the Iron Range for years are on their last legs. Rebuilt widecab GE's c... (more)
Dark clouds loom overhead as a loaded limestone train screams up Proctor hill, alongside some of the best fall color I've seen. The new overpass here is now open to traffic, and it seems in the pr... (more)
An empty limestone train has just departed Proctor Yard for the short trip down the hill to the Duluth Docks. The R921 job will handle this U714 down to the docks and bring a loaded limestone trai... (more)