ALCo 1512 at the new Aveiro harbour branch line under construction.
Over Boco river at the Aveiro harbour branch line.
At the harbour line.
A Somafel contractor "Dresine" pulling a small track ballast train in the new sea harbour branch line under construction.
A track ballast train on the new sea harbour branch line.
The track ballast is unloaded on the railroad close to the sea harbour at Gafanha da Nazaré.
A track ballast train over Boco river, Gafanha da Nazaré.
A track ballast train at the new Aveiro harbour branch line under construction.
The rail is unloaded on the new harbour branch line.
The new harbour branch line under construction.